Skip to content
Discovery Canyon Alberta 4269 73 cropped

The City of Red Deer opened the newly renovated tubing river as part of an overall $2.1M River Bend Golf and Recreation redevelopment plan in summer 2017. The tubing river was a regional attraction over the past thirty years but was in dire need of replacement. The river project required demolition and replacement of the…

Read More
theme park construction

COST recently completed two significant theme park construction projects in the Orlando market, both recognized as game-changers in the industry. The recently opened island themed water park included several key features and finishes constructed by COST shop and field crews. This project required a significant coordination effort between several fabrication departments (fiberglass (FRP), glass fiber-reinforced…

Read More
zoo exhibit fabrication

Hippos returned to the Cincinnati Zoo after a 20-year absence with the opening of Hippo Cove.  The $7.5 million project is the latest addition to the African exhibits.  The exhibit provides underwater viewing for close-ups of Henry and Bibi, the 3,000 plus pound residents.   A 70,000-gallon pool with a waterfall is showcased by a 60-foot…

Read More
Fernbank Museum - Wildwoods sensory wall

The Fernbank Museum expanded outdoors this summer with its recently opened Wildwoods exploration and outdoor adventure play area. The expansion included an elevated walkway, an interactive dry and water play area, and various nature trails. COST was contracted to assist the preconstruction team with budgeting and shop drawings and was later contracted for model building,…

Read More
El Paso Zoo Reptile 1

Quisque facilisis erat a dui. Nam malesuada ornare dolor. Cras gravida, diam sit amet rhoncus ornare, erat elit consectetuer erat, id egestas pede nibh eget odio. Proin tincidunt, velit vel porta elementum, magna diam molestie sapien, non aliquet massa pede eu diam.

Read More
Scroll To Top